Thermal Requirements

The process to comply with building regulations requires 3D Thermal modelling using a specific software system. The following slides show the modelling process of a Built up System, with the various components labelled.The whole process from start to finish takes approximately between 4 & 6 hrs depending on the complexity of the detail. All details are thermally modelled and are registered onto our database.

 

red Screen shot 1 - 19/1000 Liner dimensioned and assigned a thermal property

Screenshot 1

 

red Screenshot 2 - Eurobar Extra 135mm positioned on the liner

Screenshot 2

 

red Screenshot 3 - 32/1000 Top sheet supported by the Eurobar Extra

Screenshot 3

 

red Screenshot 4 - The insulation is added to the model

Screenshot 4

 

red Screenshot 5 - The calculation produces a visual and numerical output

Screenshot 5

 

red Screenshot 6 - When the model is cut to show the Eurobar Extra, the effect on the heat flow is visible

Screenshot 6

red Screenshot 7 - The hot and cold spots caused by the thermal break can be seen on the liner and top sheet.

 

For more Technical Downloads - Click Here